Ocean Ranger was a semi-submersible mobile offshore drilling unit that sank in Canadian waters on 15 February 1982. It was drilling an exploration well in the Grand Banks area, 267 kilometres (166 mi) east of St. John's, Newfoundland, for Mobil Oil of Canada, Ltd. (MOCAN) with 84 crew members on board when it sank. There were no survivors of the accident.

History and design

Ocean Ranger was designed by Ocean Drilling and Exploration Company, Inc. (ODECO) and constructed in 1976 by Mitsubishi Heavy Industries's Yard in Hiroshima, Japan. The vessel was a self-propelled large semi-submersible design with a drilling facility and living quarters. She was one of the largest semi-submersibles working offshore in the early 1980s. Ocean Ranger was 396 feet (121 m) long, 262 feet (80 m) wide, and 337 feet (103 m) high. She had twelve 45,000-pound (20,000 kg) anchors.[1] The weight was 25,000 tons. She was floating on two 122-metre (400 ft) long pontoons that rested 24 metres (79 ft) below the surface.[2]

The vessel was approved for 'unrestricted ocean operations' and designed to withstand extremely harsh conditions at sea, including 100-knot (190 km/h) winds and 110-foot (34 m) waves. Prior to moving to the Grand Banks area in November 1980, it had operated off the coasts of Alaska, New Jersey and Ireland. The joint Federal-Provincial Royal Commission on the Ocean Ranger Marine Disaster found that the crew were not trained, the safety equipment was inadequate, there were no safety protocols for the supply ship, and that the rig itself had a number of design flaws.

Sinking

On 26 November 1981, Ocean Ranger commenced drilling well J-34, its third well in the Hibernia Oil Field. Ocean Ranger was still working on this well in February 1982 when the incident occurred. Two other semi-submersible rigs were also drilling nearby: the Sedco 706, 8.5 miles (13.7 km) NNE, and the Zapata Ugland, 19.2 miles (30.9 km) N of Ocean Ranger. On 14 February 1982, the rigs received reports of an approaching storm linked to a major Atlantic cyclone from NORDCO Ltd, the company responsible for issuing offshore weather forecasts. The usual method of preparing for bad weather involved hanging-off the drillpipe at the sub-sea wellhead and disconnecting the riser from the sub-sea blowout preventer. Due to surface difficulties and the speed at which the storm developed, the crew of Ocean Ranger were forced to shear the drillpipe after hanging-off, after which they disconnected the riser in the early evening.

At about 1900 hours local time, the nearby Sedco 706 experienced a large, powerful wave which damaged some items on deck and caused the loss of a life raft. Soon after, radio transmissions were heard from Ocean Ranger, describing a broken portlight (a porthole window) and water in the ballast control room, with discussions on how best to repair the damage. Ocean Ranger reported experiencing storm seas of 55 feet (17 m), with the odd wave up to 65 feet (20 m), thus leaving the unprotected portlight at 28 feet (8.5 m) above mean sea level vulnerable to wave damage. Some time after 2100 hours, radio conversations originating on Ocean Ranger were heard on the Sedco 706 and Zapata Ugland, noting that valves on Ocean Ranger's ballast control panel appeared to be opening and closing of their own accord. The radio conversations also discussed the 100-knot (190 km/h) winds and waves up to 65 feet (20 m) high. Through the remainder of the evening, routine radio traffic passed between Ocean Ranger, its neighbouring rigs and their individual support boats. Nothing out of the ordinary was noted.

At 0052 hours local time, on 15 February, a Mayday call was sent out from Ocean Ranger, noting a severe list to the port side of the rig and requesting immediate assistance. This was the first communication from Ocean Ranger identifying a major problem. The standby vessel, the M/V Seaforth Highlander, was requested to come in close as countermeasures against the 10—15 degree list were proving ineffective. The onshore MOCAN supervisor was notified of the situation, and the Canadian Forces and Mobil-operated helicopters were alerted just after 0100 hours local time. The M/V Boltentor and the M/V Nordertor, the standby boats of the Sedco 706 and the Zapata Ugland respectively, were also dispatched to Ocean Ranger to provide assistance. At 0130 hours local time, Ocean Ranger transmitted its last message: "There will be no further radio communications from Ocean Ranger. We are going to lifeboat stations." Shortly thereafter, in the middle of the night and in the midst of atrocious winter weather, the crew abandoned the rig. The rig remained afloat for another 90 minutes, sinking between 0307 and 0313 hours local time.

Whilst the rig was provided with an Emergency Procedures Manual which detailed evacuation procedures, it is unclear how effectively the rig evacuation was carried out. There is evidence that at least one lifeboat was successfully launched with up to 36 crew inside, and witnesses on the M/V Seaforth Highlander reported seeing at least 20 crew members in the water at the same time, indicating that at least 56 crew successfully evacuated the rig.[citation needed] The United States Coast Guard report speculated that 'these men either chose to enter the water directly or were thrown into the water as a result of unsuccessful lifesaving equipment launching'. Rescue attempts by the standby vessels were hampered by the adverse weather conditions and the conclusion that the standby boats were neither equipped nor configured to rescue casualties from a cold sea. As a result of the severe weather, the first helicopter did not arrive on scene until 0230 hours local time, by which time most if not all of Ocean Ranger's crew had succumbed to hypothermia and drowned. Over the next week, 22 bodies were recovered from the North Atlantic. Autopsies indicated that those men had died as a result of drowning while in a hypothermic state.

Causes and aftermath

Ocean Ranger's vulnerability to a rogue wave illustrated.
1 – For comparison, the Draupner wave 59 ft/18 m
2 – 28 ft/8.5 m
3 – Location of the ballast control room

The remains of the rig were found by sonar search over the following weeks, resting in an inverted position approximately 485 feet (148 m) south-east of the wellhead, surrounded by major items of debris such as the derrick. The rig had capsized bow-first, turning over and striking the sea floor with the forward ends of the rig's pontoons. The United States Coast Guard Marine Board of Investigation report into Ocean Ranger sinking summarised the chain of events leading to the loss of Ocean Ranger as follows:

A Canadian Royal Commission spent two years looking into the disaster. The commission concluded that Ocean Ranger had design and construction flaws, particularly in the ballast control room, and that the crew lacked proper safety training, survival suits and equipment. The Canadian Royal Commission also concluded that inspection and regulation by United States and Canadian government agencies was ineffective. In addition to key recommendations for Canada's offshore oil and gas industry, the commission recommended that the federal government invest annually in research and development for search and rescue technologies, such as improving the design of lifesaving equipment—a commitment that has been met in every fiscal year since 1982.

Compensation and Commemoration

Lawsuits arising from the sinking were settled out of court with a package cumulatively valued at $20-million.[3] A permanent monument to those who died was created on the grounds of the Confederation Building, the seat of the provincial government.[3

In Fiction

The sinking of the Ocean Ranger is a topic of Canadian author Lisa Moore's 2009 novel, February. The novel depicts the fictional life of Helen O'Meara as she grieves the loss of her husband, Cal, who died aboard the oil rig. On July 27, 2010, February was selected as one of 13 books on the longlist of the 2010 Man Booker Prize.[4]